Land Development-IV

Organization

 

dld-iv

 

Functions

 

Powers of the Land Development Directorate.

1. To sign agreements for exemption of all types of plots in accordance with the instructions, orders and policy in force, from time to time.
2. To sign exchange deeds in respect of plots in accordance with the instructions, orders and policy in force, from time to time.
3. To grant extensions in building periods, on payment of prescribed surcharge, in accordance with the instructions, orders and policy in force from time to time.
4. To cancel the exemption of any plot for violation of any term or condition of the Agreement in respect of such plot and to forfeit the whole or part of the earnest money in respect thereof.
5. To revive the exemption of any plot in accordance with the instructions, orders and policy in force from time to time.
6. To allow transfers of exempted plots in accordance with the instructions, orders and policy in force, from time to time.
7. To permit extensions in the periods for payments, of the Authority's dues, subject to payment of interest at prescribed rates, and upto six months in all.
8. To sanction rebates of development charges in accordance with the instructions, orders and policy in force from time to time.

 

Procedures

 

1.Land owner/applicant applies for grant of exemption along with latest attested copies of Fard Malkiat, Fard Intiqal, Sale Deed, Affidavit, General Power of Attorney and photo copy of National Identify Card.

2.LAC Branch examines above documents and certifies title as well as entitlement of the land owner/applicant. LAC Branch also certifies that the land owner/applicant's land has been utilized by LDA by way of Kabza Karwai. LAC Branch also certifies that the land owner/applicant has not received any cash compensation against his land holding.

3.Exemption Branch allocates file number and makes entries in the Khasra War Register.

4.After allocation of file number concerned Patwari certifies that no other file exists in the name of such land owner/applicant. Concerned Patwari also certifies that granting of exemption in favour of such applicant/land owner will not lead to any excess area exemption.

5.After the above procedure file is sent to the Accounts Branch which issued computerized first demand notice against development charges.

6.The land owner after receiving the demand notice deposits the required amount into the LDA accounts.

7.After payment of first demand notice the concerned revenue staff sof exemption branch calculates the entitlement of the applicant/land owner on the basis of the record/certification provided by the LAC Branch. Such entitlement is checked/verified by staff Officer, Assistant Director and Deputy Director concerned.

8.The above documentation is placed before the Director Land Development LDA who grants exemption.

9.After the grant of exemption order, the file is sent to the Allocation Committee who after scrutinizing the entire file/record allocates a suitable plot as per policy.

10.After the above steps allocation letter is issued.

11.Part plan is issued by the Town Planning Wing after exercising due care, deliberations and also keeping in view various quotas.

12.In case the part plan shows any excess area then file is sent to the Price Assessment Committee of LDA for assessing market price of the said excess area.

13.The Accounts Branch prepares/issues final demand notice which also incorporates the market price, as assessed by the Price Assessment Committee, of any excess area.

14.All land owner/applicant deposits the demand so raised into the LDA accounts.

15.The land owner/applicant may apply for the issuance of possession letter which allows him the physical possession of the plot in question. The Estate Branch is responsible for handing over the physical possession to the land owner/applicant/exemptee in response to the land possession letter issued by the Land Development Directorate.

The land owner/applicant may then apply for the execution of exchange deed in his favour. After execution of the same, LDA totally alienates its rights over the plot in question, in favour of the land owner/applicant. However for the execution of such exchange deed, issuance of completion certificate by the Town Planning Branch and No Recovery Certificate by the Accounts Branch are a pre-requisite.

 

 

1.Land owner/applicant applies for grant of exemption along with latest attested copies of Fard Malkiat, Fard Intiqal, Sale Deed, Affidavit, General Power of Attorney and photo copy of National Identity Card.

2.LAC Branch examines above documents and certifies title as well as entitlement of the land owner/applicant. LAC Branch also certifies that the land owner/applicant's land has been utilized by LDA by way of Kabza Karwai. LAC branch also certifies that the land owner/applicant has not received any cash compensation against his land holding. NOC is issued accordingly.
3.Exemption Branch allocates file number and makes entries in the Khasra War and Radeef War registers.
4.After allocation of file number concerned Patwari certifies that no other file exists in the name of such land owner/applicant. Concerned Patwari also certifies that granting of exemption in favour of such applicant/land owner will not lead to any excess area exemption.
5.After the above procedure the concerned revenue staffs of exemption branch calculates the entitlement of the applicant/land owner on the basis of the record/ certification provided by the LAC Branch. Such entitlements checked/verified by Staff Officer. Assistant Director and Deputy Director concerned.
6.The above documentation is placed before the Director Land Development LDA grants exemption.
7.After the grant of exemption order, the file is sent to the Allocation Committee. Who after scrutinizing the entire file/record allocates a suitable plot as per policy.
8.After the above steps allocation letter is issued.
9.Part plan is issued by the Town Planning Wing after exercising due care, deliberations and also keeping in view various quotas.
10.In case the part plan shows any excess area then file is sent to the Price Assessment Committee of LDA for assessing market price of the said excess area.
11.The Accounts Branch prepares/issues final demand notice which also incorporates the market price, as assessed by the Price Assessment Committee, of any excess area.
12.The land owner/applicant deposits the demand so raised into the LDA accounts.
13.All the dues deposited into the LDA accounts are verified by the Finance Directorate and after such verification an agreement is executed between LDA and land owner/applicant and registered with the concerned Sub Registrar, Lahore.
14.The land/owner/applicant may apply for the issuance of possession letter which allows him the physical possession of the plot in question. The Estate Branch is responsible for handing over the physical possession to the land owner/applicant/exemptee in response to the possession letter issued by the Land Development Directorate.
15.The land owner/applicant may then apply for the execution of exchange deed in his favour. After execution of the same LDA totally alienates its rights over the plot in question in favour of the land owner/applicant. However for the execution of such exchange deed issuance of completion certificate by the Town Planning Branch and issuance of No Recovery Certificate by the Accounts Branch are a pre-requisite.

Consequent upon the completion of all codal formalities and after having physical possession at site, construction is raised thereon in accordance with the sanctioned plan duly approved by the Director Town Planning, LDA. When transfer of plot is required, following procedure on the prescribed transfer application has to be submitted before the LDA authorities:-

1. Copy of the clearance certificate/NOC for transfer of plot which will be based on the completion of following facts/certificate:-
        a. Verification of title.
        b. Verification for double exemption as to whether any other exemption of plot(s) has already been granted earlier to this claim.
       c. Excess area. If exemption has been granted over and above the actual ownership.
       d. Verification of dues/deposited amounts from the General Cash Book section, Directorate of Finance, LDA.
       e. Valid Building period in respect of plot, required to be transferred.
2. An Affidavit each from the seller & purchaser duly attested by Notary Public and countersigned by a Magistrate or any other Gazetted Officer alongwith two private witnesses.
3. Three specimen signatures duly attested by Gazetted officer of the seller/purchaser. This must also identified by a private witness.
4. Photographs both of the seller and the purchaser, duly attested by a First Class Gazetted officer.
5. Photocopies of National Identity Cards of both the seller and the purchaser.
6. Certified copy of General Power of Attorney by the Sub Registrar (if it is sold through the General Attorney), which had already been published through National Newspaper for the want of objections from the general public.
7. If plot had been mortgaged with any bank/financial institution, then certified copy of the redemption deed from the sub Registrar alongwith copy of the original permission to mortgage/assigned issued by the LDA will have also be supplied to the office attached with the transfer application.
8. On receipt of TRANSFER APPLICATION both the parties will have to appear before the LDA authorities to verify their physical presence and verification of the deal on the schedule date and time given by the One Window Operation Cell, LDA. After having deposited transfer fee, transfer of plot is approved/implemented in LDA.

RATES FOR TRANSFER OF EXEMPTED PLOTS

In accordance with office order No.LDA/7041 dated 24/10/1993 issued by the competent authority, rates for the transfer of exempted plots (carved out in Marla's) have been levied categorically as per schedule given below:-

FOR THE TRANSFER OF EXEMPTED PLOTS
AREA IST
TRANSFER
(RS.)
2ND
TRANSFER
(RS.)
3RD
TRANSFER
(RS.)
4TH
TRANSFER
(RS.)
5TH
TRANSFER
(RS.)
Up to 3-Marla 3,000/- 5,000/- 7,000/- 9,000/- Constant
Up to 5-Marla 5,000/- 10,000/- 15,000/- 20,000/- Constant
Up to 7-Marla 10,000/- 15,000/- 25,000/- 45,000/- Constant
Up to 12-Marla 25,000/- 40,000/- 60,000/- 80,000/- Constant
Up to 22-Marla 40,000/- 50,000/- 70,000/- 1,00,000/- Constant

 TRANSFER RATES SHOWN FOR SCHEMES WHERE PLOTS HAVE BEEN CARVED OUT IN METERS

AREA IST
TRANSFER
(RS.) /S.q.m
2ND
TRANSFER
(RS.)/S.q.m
3RD
TRANSFER
(RS.)/S.q.m
4TH
TRANSFER
(RS.)/S.q.m
5TH
TRANSFER
(RS.)/S.q.m
Upto 3-Marla
72 Sq.m.
42/- 70/- 97/- 125/- Constant
Upto 5-Marla
105 Sq.m.
48/- 95/- 143/- 190/- Constant
Upto 7-Marla
160 Sq.m.
62/- 94/- 156/- 281/- Constant
Upto 12-Marla
250 Sq.m.
100/- 160/- 240/- 320/- Constant
Upto 22-Marla
over 250 Sq.m.
87/- 108/- 152/- 216/- Constant

TRANSFER OF PLOTS (WHERE TRANSFER FEE IS NOT APPLICABLE)
The transfer of plots to spouse & children, amicable settlement, cases of co-sharers, wills, family members & plots sub-divided between the legal heirs, have been brought under the ambit of free transfer cases.

In case NOC for Sui Gas connection/Permission to Mortgage is needed by the exemptee/transferee of plot, then, the exemptee/transfree will apply for the requisit document on a simple application. If NOC for loan is required then the petitioner will also indicate the name of bank/Financial Institution. Sui Gas charges are reccoverable on adhoc basis in LDA as per the following scheduled rates

SIZE OF PLOT SUI GAS CHARGES
420 Sq.M. (1-Kanal) Rs. 16,000/-
250 Sq.M. (12-Marlas) Rs. 9,524/-
160 Sq.M. (7-Marlas) Rs. 6,095/-
105 Sq.M. (5-Marlas) Rs. 4,000/-
72 Sq.M. (3-Marlas) Rs. 2,781/-
 
Whenever NOC for loan/permission to mortgage is required by exemptee/transferee name of the bank/Financial Institution as mentioned by the petetioner will be incorporated in the given specimen of the permission to mortgage, after having completed all codal formalities prescribed under the law. However, NOC for loan is not issued in favour of the petitioner when he had completed construction on the plot and Completion Certificate stands issued by the Town Planning, LDA.

 

According to the prevailing policy, 4 years building construction period is granted to the ex-land owners who are exempted developed plots to construct thereon. After expiry of the 4 years building period, extension can be granted subject to the payment of prevalent rates as envisaged in the policy circular No.SO(D-III) HP&EP-2-3/92, dated 13-03-2000 issued by the Housing Physical and Environmental Planning Department, Government of the Punjab:-

AREA OF PLOT RATE OF PENALTY
Upto 5 marla Rs. 1,000/- per year
Above 5 marla to less than 10 marla Rs. 2,000/- per year
10 marla less than 1-kanal Rs. 5,000/- per year
1-kanal and above Rs. 10,000/- per year
 

 

Under clause-V of the Policy of the Government on the cited subject notified vide No.SO(D-II)HP&EP-2-3/92 dated 19.10.93, building period extension is to be given free of surcharge to the allottees of the scheme, where the concerned housing agencies have not been able to provide utilities of Water Supply, Sewerage, Roads, Electricity. As per exercise conducted by Chief Engineer Wing, LDA, the development position of M.A. Johar Town Scheme Phase-I & II, where development of under mentioned components/basic amanities has not yet been completed, is as under:-

 

The Competent Authority has allowed free extension in building period in cases of aforementioned plots, for a period of one year, from the date of issue of this letter. Further extension beyond one year can be made if the aforementioned amenties are not provided within the above period.
This issues with the approval of the competent Authority.

 

Policies

Exemption policy for the three Housing Schemes, namely, M.A.Johar Town, Sabzazar and Mustafa Town, has been framed under the relevant provision of the Punjab Acquisition of Land (Housing) Act,1973, read with MLI-23 and instructions as contained in letter No. SO(DA)H&PP-I-41/81 dated 22nd May.1982,of the Housing and Physical Planning Department, Government of the Punjab. The main decisions regarding the Exemption Policy taken from time to time and as envisaged in the minutes of the meeting dated 27.1.1983 have been adopted for implementation as under:-

 

  1. No application will be invited for exemption but instead the owners shall have entitlement of exemption by virtue of the Award, Part-C, which will be in fact an 'ENTITLEMENT CERTIFICATE' for each owner as envisaged in the H&PP-I-4/81 dated 22.5.1982, announced by the Collector. This will, however, not apply in the case of Mustafa Town Scheme because applications have already been invited and the cases are under process.
  2. As soon as the Award is published, a public notice will be published in prominent daily newspapers inviting the awardees to inform the Land Acquisition Collector of their full postal address through a letter posted under postal certificate. It shall be the responsibility of the awardee to report any further change in his postal address through a similar procedure.
  3. Every owner will be entitled to 30% exemption in the shape of developed plots. However, since the entitlement may not fit in exactly with the sizes of available plots, the allocation of plots against various entitlements shall be in accordance with the following policy:-
  4. Against an entitlement upto 4 marlas a plot of 72 Sq. meters shall be allocated.
  1. Above 4 marlas to 6 marlas, a plot of 105 Sq. meters.
  2. Above 6 marlas upto 8 marlas, a plot of 160 Sq. meters.
  3. Above 8 marlas to 9 marlas, two plots of 72 Sq. meters and one plot of 105 Sq. meters.
  4. Above 9 marlas to 11 marlas, two plots of 105 Sq. meters each.
  5. Above 11 marlas to 13 marlas, a plot of 250 Sq. meters.
  6. Above 13 marlas to 16 marlas, one plot of 250 Sq. meters and one plot of 72 Sq. meters.
  7. Above 16 marlas to 18 marlas, one plot of 250 Sq. meters and one plot 105 Sq. meters.
  8. Above 18 marlas to 19M-224Sft, one plot of 250 Sq. meters and one plot of 160 Sq. meters.
  9. From one kanal to 1K-2M-224 Sft, one plot of 420 Sq.meters.
  10. From 1K-3M to 1K 4M one plot of 420 Sq. meters and one plot of 72 Sq. meters and so on so forth provided no owner will be exempted more than fifteen plots of 420 Sq. meters. The entitlement exceeding fifteen plots will be met by allocating plots smaller than one kanal in accordance with clause (e).
  11. Under the provisions of MLI-23 all owners below ten marlas are entitled to cash compensation only. The minimum size of plot which MLI-23 provides is a 3 marlas plot i.e. 72 Sq. meters. There is no provision in the MLI-23 for a plot less than 72 Sq. meters.
  12. In order to cope with the fullest possible entitlement of an owner, the entitlement will be met by allocating plots from the higher category to the lower category.
  13. Every effort will be made to allocate a plot or plots to the exemptee on or around the piece of land he owned prior to the acquisition of his land.
  14. The cash compensation for the remaining land as per apportionment announced by the Land Acquisition Collector in the award will not be payable to the owners in cash but shall be adjusted towards the development charges of the exempted plots as per decision of the H&PP letter No.SO(DA)H&PP-1-4/82 dated: 22.5.1982.
  15. Existing residential houses lawfully constructed will be adjusted in the scheme on the following terms:-
    1. The owner will be exempted 30% of the covered area as per policy, and Reserve Price will be charged on the excess area already existing under his house or given to him on his request. This will apply to a proper house, not merely one room and boundary wall. `Proper' house must consist of at least one living unit to include a drawing room, a dining room, a kitchen, a bath room, and a bed room. The area enclosed by the boundary wall would not automatically be considered to form part of a house. Uncovered space shall not be more than what is laid down in LDA bye-laws as front space, rear space and side space. The small area that cannot be otherwise utilized may be given at Reserve Price if it is in excess of 30% exemption on the recommendations of DLD and TP after their site inspection and final approval by the D.G. LDA.
    2. Development charges against 30% entitlement will be charged from the owner.
    3. If any part of the super-structure/ residential house is required for road/ street planning, it shall be surrendered by the owner on payment of compensation. If a lawfully constructed house has to be removed because it clashes with town planning of the area, not only would cash compensation be paid for the super- structure but an equal size plot would also be given. Exemption policy would be applicable to this plot also as explained at sub-para.
    1. All dues will be payable in lump-sum within a period of six weeks from the date of issue of Demand Notice. On late payments a surcharge @ 15% per annum will be charged from the exemptee. This rate of surcharge will be subject to revision according to instructions of competent authority from time to time. If all dues are not cleared within four and a half month (twelve weeks initial grace period and six weeks extension on payment of surcharge also) from the date of issue of Demand Notice, the exemption shall be liable to be withdrawn.
    2. A two years building period, free of surcharge, will be allowed with effect from six weeks after the date of issue of the Exemption Letter. The exemptee is obliged to take possession of his plot from LDA within these six weeks. If he fails to take possession of his plot within the said six weeks, the possession would be deemed to have been given to him. Any further extension in the building period will be on payment of surcharge as prescribed by the competent authority.
    3. The exemptee will be allowed to sell his interest in the plot exempted to him after six weeks from the date of issue of the Exemption Letter during which period the exemptee is obliged to take possession of his plot from LDA, on payment of due transfer fee and with prior approval of LDA on submission of transfer application on prescribed proforma. As soon as transfer has been allowed, the transferee shall have no claim on LDA in respect of exemption and /or possession.
    4. An additional surcharge @ 5% of the Reserve Price shall be recoverable in respect of corner plots exempted! this will be in addition to the development charges payable by the exemptee.
    5. The Government vide their letter No.SO(DA)H&PP-1- 41/81 dated 22.5.1982 has desired that the procedure of execution/registration of Agreement in cases of exempted plots be eliminated. As such the Exemption Letter may be re-drafted in such a manner that it may cover all the conditions. Exemption Letter will replace the Agreement. Exemption Letter must clearly lay down that it is incumbent upon the exemptee to take possession of the exempted plot within six weeks of the issue of the Exemption Letter. If the exemptee fails to take possession of his plot during the said period, the possession would be deemed to have been given to him. However, if the exemptee is unable to take possession of his plot for any cogent reasons and provided he makes a written request through a registered letter before the prescribed period of six weeks lapses the LDA may agree to look after his plot for a maximum period of six months on prior full payment of fee @ Rs. 1,000/- per month or part thereof, per plot.
    6. For the transfer of an exempted plot the following pre-conditions are prescribed:-
    1. No dues be outstanding against the exemptee in favour of LDA. A period of six weeks should have expired from the date of issue of the Exemption Letter.
    2. A Written application is made by the exemptee prior to approval of the proposed transfer on the prescribed proforma. The Application must certify that the exemptee has taken physical possession of the plot.
    3. The proposed transferee must certify that he understands that he would have no claim whatsoever on LDA.
    4. Both the exemptee and the transferee should be present before Director Land Development alongwith their National Identity Cards.
  1. The exemptee will be required to get building plan for construction of house, sanctioned by the Town Planner of LDA and complete the building accordingly within the prescribed building period. He will also be required to obtain a completion certificate from Town Planner, LDA. Building period shall be countable to the date on which application for completion certificate is received in the Town Planning Branch of LDA.
  2. If at any stage the title of an exemptee is proved to be defective the exemption of the plot shall stand automatically withdrawn and LDA will be entitled to take over the land alongwith structures(s) standing thereon without payment of any damage or compensation.
The scheme was initiated in the year 1975 comprising of an area measuring 537 acres situated between Mian Mir Storm Water Drain and Bund Road. It is known as Gulshan-e-Ravi Scheme. With the approval of the Government the Authority has framed and enforced the following policy of exemption of residential plots to the owners of land acquired under the Land Acquisition Act 1894.
50% of the area of individual holding will be deducted for construction of roads and open spaces and the remaining 50% of the ownership will be exempted in favour of individual land owner on the basis of entitlement indicated below subject to maximum size of the one plot of 10-Marla's on payment of development charges.
The maximum size of plot to be exempted will be 10-Marla's.
 
The entitlement for exemption of a particular size of plot will be determined on the following basis :-
 
1.Each individual land holder owning land from 1-Kanal and above will be exempted a plot of 10-Marla's size.
 
2.Each individual land holder owning land from 19-M to 14-M will be exempted a plot of 7-Marla's.
 
3.Each individual land holder owning land from 13-M to 10-M will be exempted a plot of 5-Marla's size.
 
4.Each individual land holder owning land from 9-M to 6-M will be exempted a plot of 3-Marla's size.
The owner of land less than 6-Marla's holding will not be entitled for any exemption.

 

 

1.As per policy the existing colonies shall be accommodated in the over all scheme without any major modification in their layout..
 
2.Anjuman-e-Mutasarin-e-Bund Road Scheme shall provide necessary proof/undertaking from the original owners of the land to the effect that the area under roads in the colonies would be surrendered in favour of the LDA free of cost.
 
3.Owners of plots in the existing colonies shall be exempted their respective plots.
 
4.As regards the development charges the owner of plot in the colonies shall be required to pay for only those additional services which the LDA would provide during execution of scheme.
 
5.Any plot owner in the existing colonies would be allowed to undertake construction subject to the execution of an interim development agreement with the LDA. Whereafter the building plans shall be sanctioned in accordance with the byelaws.
 
6.In all adjusted colonies (where layout has been properly drawn) deduction of land on account of contribution towards roads and open spaces shall not be made. In other words area owned by individual shall be treated as his entitlement.
 
7.Development charges in the adjusted colonies would be levied on no profit no loss basis. These may vary from Rs. 7,000/- to 16,000/- per kanal in respect of various colonies as against Rs. 25,000/- for the rest of the scheme area.
All houses constructed up to 1st May 1978 even if falling outside the adjusted colonies, and whether constructed legally or not, will also be treated as adjusted except those which conflict with the scheme proposals. Those houses, which have to be demolished due to unavoidable circumstances in exceptional cases, shall be acquired and the other will be granted exemption of plot in addition to compensation for the structure.
 

 

Processes

 

Sr.No Process Completion Days
 
ATTESTED COPY CHALLAN LD
1 Double Exemption Report 3
2 Ownership Verification 3
3 Challan Issuance 3
Total Completion Days 9
ATTESTED COPY ISSUE LD
1 Atteseted Copy Issuance 3
Total Completion Days 3
Allocation Letter
1 OTHER 15
Total Completion Days 15
BUILDING PERIOD EXTENSION LD
1 Double Exemption Report 3
2 Ownership Verification 3
3 Challan Issuance 3
Total Completion Days 9
CHANGE OF PLOT LD
1 Getting Reports from TP 6
2 Approval from Authority 4
3 Sending to Allocation Committee 3
Total Completion Days 13
CHECKING OF FILE LD
1 Processing 3
Total Completion Days 3
CONST. OF DUP. FILE(ALLOTTEE)
1 ESTATE OFFICER REPORT 2
2 VERIFICATION OF CC (TP) 2
3 LODGING AN FIR 3
4 PUBLICATION OF NOTICE 10
5 APPROVAL BY DIRECTOR 3
6 VERIFICATION OF ALLOTMENT 3
7 CREDIT VERIFICATION 3
8 COMPLETION OF ENQUIRY 20
Total Completion Days 46
CONST. OF DUP. FILE(EXEMPTEE)
1 DOUBLE EXEMPTION REPORT 3
2 OWNERSHIP REPORT BY LAC 3
3 CREDIT VERIFICATION 3
4 ESTATE OFFICER REPORT 2
5 COMPLETION OF ENQUIRY 20
6 LODGING AN FIR 3
7 PUBLICATION OF NOTICE 10
8 APPROVAL BY DIRECTOR 3
9 VERIFICATION OF CC (TP) 2
Total Completion Days 49
CONST. OF DUP. FILE(TRANSFEREE)
1 VERIFICATION OF CC (TP) 2
2 DOUBLE EXEMPTION REPORT 3
3 OWNERSHIP REPORT BY LAC 3
4 CREDIT VERIFICATION 3
5 ESTATE OFFICER REPORT 2
6 COMPLETION OF ENQUIRY 20
7 LODGING AN FIR 3
8 PUBLICATION OF NOTICE 10
9 APPROVAL BY DIRECTOR 3
Total Completion Days 49
Complaint
1 OTHER 8
Total Completion Days 8
DUPLICATE FILE LD
1 Double Exemption Report 3
2 Ownership Verification 3
3 Payment Verification 3
4 Inquiry 10
5 Report Submission 3
6 Authority Approval 3
Total Completion Days 25
EXECUTION OF TRANSFER DEED LD
1 Getting Part Plan 3
2 Double Exemption Report 3
3 Ownership Verification 3
4 Verification From Accounts 5
5 NRC Certificate Issuance 3
6 Legal Report 3
7 Transfer Deed Approval 3
8 Transfer Deed Registeration 3
Total Completion Days 26
EXEMPTION APPROVAL LD
1 Payment Verification 3
2 Exemption Approval 4
Total Completion Days 7
EXEMPTION CHALLAN LD
1 Sending Publication 3
2 Time for Objection 15
3 Demand Notice Issuance 3
Total Completion Days 21
EXEMPTION LETTER LD
1 Payment Verification 3
2 Exemption Letter Issuance 3
Total Completion Days 6
EXEMPTION PUBLICATION LD
1 Ownership Verification 3
2 Double Exemption Report 3
3 Challan Issuance 5
Total Completion Days 11
FINAL DEMAND NOTICE LD
1 Part Plan Issuance 6
2 Demand Notice Issuance 3
Total Completion Days 9
FIRST DEMAND NOTICE
1 OTHER 9
Total Completion Days 9
GIFT TRANSFER LD
1 Double Exemption Report 3
2 Ownership Verification 3
3 Payment Verification 3
4 Identification 3
5 Computerized Docs Processing 3
6 Letter Issuance 3
Total Completion Days 18
LEIN REMOVAL
1 OTHER 5
Total Completion Days 5
Lien Marking
1 OTHER 5
Total Completion Days 5
NOC/CLEARANCE CHALLAN LD
1 Double Exemption Report 3
2 Ownership Verification 3
3 Payment Verification 3
4 Certificate Issuance 3
Total Completion Days 12
NOC/CLEARANCE ISSUE LD
1 Certificate Issuance 3
Total Completion Days 3
Other LD
1 Other 7
Total Completion Days 7
PHYSICAL POSSESSION LD
1 Sending File to EM 3
2 Possession Letter Issuance 12
Total Completion Days 15
POSESSION ORDER LD
1 Possession Order 3
Total Completion Days 3
PTM CHALLAN LD
1 Double Exemption Report 3
2 Ownership Verification 3
3 Payment Verification 3
4 Challan Issuance 3
Total Completion Days 12
PTM ISSUE LD
1 Certificate Issuance 1
2 Identification 2
Total Completion Days 3
PUBLICATION CHALLAN LD
1 Letter Issuance to Sub-Registerar 3
2 Publication Challan Issuance 3
3 Publication Letter Issuance 4
Total Completion Days 10
PUBLICATION ISSUE LD
1 Publication Notice Issuance 4
Total Completion Days 4
Placement of Docs Challan
1 OTHER 8
Total Completion Days 8
Placement of Docs Issue
1 OTHER 4
Total Completion Days 4
Stay Order
1 OTHER 8
Total Completion Days 8
TRANSFER By S. DEED CHALLAN LD
1 Letter Issuance to DPR 3
2 Time for Objection 15
3 Challan Issuance 3
Total Completion Days 21
TRANSFER By S. DEED ISSUE LD
1 Letter Issuance 3
Total Completion Days 3
TRANSFER LEGAL HEIRS LD
1 Advice from ADL 3
2 Letter Issuance 3
Total Completion Days 6
TRANSFER PLOT CHALLAN LD
1 Double Exemption Report 3
2 Ownership Verification 3
3 Payment Verification 3
4 Challan Issuance 3
Total Completion Days 12
TRANSFER PLOT ISSUE LD
1 Payment Verification 3
2 Identification 2
3 Computerized Docs Processing 3
4 Letter Issuance 3
Total Completion Days 11
Transfer By S. Deed Pub LD
1 Letter Issuance to Sub-Registerar 3
2 Double Exemption Report 3
3 Ownership Verification 3
4 Payment Verification 3
5 Publication Challan Issuance 6
Total Completion Days 18
U. GIFT TRANSFER CHALLAN LD
1 Payment Verification 1
2 U. Gift Challan Issuance 1
3 Double Exemption Report 1
4 Ownership Verification 1
Total Completion Days 4
U. GIFT TRANSFER ISSUE LD
1 Identification 1
2 G. Transfer Letter Issuance 1
3 Payment Verification 1
Total Completion Days 3
U. TRANSFER CHALLAN LD
1 Double Exemption Report 1
2 Ownership Verification 1
3 Payment Verification 1
4 U. Challan Issuance 1
Total Completion Days 4
U. TRANSFER ISSUE LD
1 Payment Verification 1
2 Identification 1
3 Transfer Letter Issuance 1
Total Completion Days 3
Verification Of Documents
1 OTHER 8
Total Completion Days 8

 

 

Contact

 

INCHARGE :                              Director Land Development-IV
TELEPHONE:                           (092) 042-99262245
POSTAL ADDRESS :              2nd Floor, 467 Block D/2 M.A  Johar Town ,Lahore, Pakistan.